QUESTION 1
In SAP ECC, you want to map an in-house production process for general warehouse production. The fields in the area of the lot size-dependent in-house production time are to be populated when the material master for the final product is created. These fields can be maintained by updating from the scheduling result for the associated routing. You now think that there could be significant changes to the production times in the routing and decide against updating the material master. What problem could this lead to?

A.    Subsequent capacity planning is no longer possible due to the obsolete scheduling parameters.
B.    Requirements planning runs up against an exception message in basic dates scheduling because
the material master parameters do not match the scheduling result from the routing.
C.    In the course of basic dates scheduling with requirements planning, dependent requirements request
the components from the bill of materials at the wrong times.
D.    Lead time scheduling, which occurs by the time that a planned order is converted into a production
order (at the latest), cannot take place on the basis of incorrect basic dates.

Answer: C

QUESTION 2
Which of the following requirements for a manufacturing plant can be supported by using process manufacturing? (Choose three.)

A.    Master recipe-based manufacturing.
B.    Material requirements planning for production resources.
C.    Manufacturing without orders.
D.    Variable calculation of material quantities (product output, material usage).
E.    Manufacturing in charge quantities.

Answer: ADE

QUESTION 3
Which objects can you use in the production order for a material component to propose the storage location in its reservation? (Choose three.)

A.    Routing
B.    Work center
C.    Material master (component)
D.    Material master (product)
E.    Production version

Answer: BCE

QUESTION 4
From what point can you no longer use the Read PP master data in the production order?

A.    After printing the order papers.
B.    After the first posting of goods movements or confirmation.
C.    From the release of the production order.
D.    After assigning the confirmed quantity of a material component due to carrying out a material
availability check.

Answer: B

QUESTION 5
Which options can you offer someone who uses the SAP ECC system for production orders and requires support for material supply in production? (Choose three.)

A.    Automatic generation of a transport order
B.    Material directory
C.    Pull list
D.    Pick list
E.    Logistics Information System (LIS)

Answer: ACD

QUESTION 6
When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation. What can be the origin of the formula parameters used for scheduling? (Choose three.)

A.    General values from work scheduling view in the material master
B.    Standard value from operation in task list
C.    User-defined field from operation in task list
D.    General operation values in task list
E.    General item values in bill of materials

Answer: BCD

QUESTION 7
A user has entered planning strategy group 10 (make-to-stock production) in the material master (SAP ECC) of a product. For the coming months, requirements with requirement type LSF (derived from the main strategy 10) have been planned. The user would like to change the requirement type from LSF to VSF planning with final assembly (in accordance with planning strategy 40) for requirements in the production plan that have already been saved. Which of the following statements are applicable in this case? (Choose two.)

A.    The user has to change the requirement type for planning strategy 10 to VSF planning with final
assembly in Customizing. The requirement type for all existing requirements is then changed
automatically.
B.    The present requirement for the product can be changed manually from LSF to VSF in the
Requirement Type field in the production plan, so that the new strategy 40 determines the next
planning operation.
C.    The user can enter the new planning strategy group 40 in the material master of the product,
but the requirement type is not changed automatically for existing requirements.
D.    The planning strategy group can be changed from 10 to 40 in the existing production plan, and
the requirement type for all requirements is changed automatically.

Answer: BC

QUESTION 8
Which of the following statements about the planning functions available in SAP ECC are true? (Choose two.)

A.    Master production scheduling (MPS) refers to preferred planning of important materials.
B.    Material requirements planning (MRP) does not include automatic capacity leveling.
C.    Long-term planning (LTP) is a long-term form of forecast planning.
D.    In demand management (DM) material shortage situations are identified and given requirement
coverage elements.

Answer: AB

If you want to pass SAP C_TSCM42_65 successfully, donot missing to read latest lead2pass SAP C_TSCM42_65 practice tests.
If you can master all lead2pass questions you will able to pass 100% guaranteed.

http://www.lead2pass.com/C-TSCM42-65.html

Why Choose Lead2pass?

If you want to pass the exam successfully in first attempt you have to choose the best IT study material provider, in my opinion, Lead2pass is one of the best way to prepare for the exam.

Lead2pass Testking Pass4sure Actualtests Others
$99.99 $124.99 $125.99 $189 $29.99-$49.99
Up-to-Dated
Real Questions
Error Correction
Printable PDF
Premium VCE
VCE Simulator
One Time Purchase
Instant Download
Unlimited Install
100% Pass Guarantee
100% Money Back